JUNE 30TH, 2008
Mat Inventory Acquisition
Northern Bridge & Mat Rentals finalized an agreement to purchase Peak Energy Services oak access mat inventory. This acquisition strengthens our market position with inventory in several new locations throughout British Columbia, Alberta and Saskatchewan. In conjunction with the purchase of the oak access mat inventory, NBMR hired Peak's former Matting Manager, Ron Modrall to manager our operations in Fort Nelson, BC.
Darren Francis - President
 
Project: Chicken Run Road Access
Date: Nov 2005 – March 2006
Location: South of Grande Prairie, AB
Client: Talisman Energy Inc
Companies Involved: Northern Bridge & Mat Rentals Ltd, Ruskin Construction Ltd, Frontier Resources.
Scope of work: Provide temporary portable bridges and mats to span creeks and maintain access during the construction of 14km of high grade road. Crossing lengths were 40' to 120' in length. Permanent structures were installed by Ruskin Construction upon completion of the high grade road.
Photos:
        
   
 
Project: 100 foot Oilfield Portable Weyerhaeuser North Road
Date: Dec, 2005
Location: South of Grande Prairie, AB
Client: Berens Energy Ltd
Companies Involved: Northern Bridge & Mat Rentals Ltd
Scope of work: Supply and install L-100 Oilfield Portable Bridge, 100' long to gain access to an area to allow drilling to take place in the winter of 2006
Photos:
Before:
  

After:
        
   
 
Project: 80' Carrot Creek
Date: July 2005
Location: Edson, AB
Client: Compton Petroleum Corporation
Companies Involved: Northern Bridge and Mat Rentals Ltd, Ruskin Construction Ltd
Scope of work: Supply and install 80' Oilfield Portable Bridge to access north side of Carrot Creek. The existing bridge on site was old and condemned and therefore unavailable and unsafe for use.
Photos:
   
 
Project: 100' ProEx Energy
Date: Aug 2005
Location: Ft St John, BC
Client: ProEx Energy
Companies Involved: Northern Bridge and Mat Rentals Ltd, Ruskin Construction Ltd.
Scope of work: Northern Bridge and Mat Rentals Ltd, Ruskin Construction Ltd. Scope of Work: Supply and install permanently 100' Oilfield Portable bridge with rubber running strips (wear strips) on high grade road near Ft St John BC.
Photos:
    
   
 
Project: South Wapati 3 km access
Date: July 2004
Location: South of Grande Prairie, AB
Client: Cyries Energy
Companies Involved: Northern Bridge and Mat Rentals Ltd
Scope of work: Supply and install 3 ply oak matting for 2km of access road and 100m x 100m lease (2200 mats) to allow access to area for drilling purposes. Access road and lease consisted of wet muskeg area and very soft sandy ground. Some ground was so wet and soft matting was double layered to keep vehicles traveling on the temporary road stable.
Photos:
  
   
 
Project: Silver pipeline access
Date: July 2005
Location: 25km North Grande Cache, AB
Cliet: Devon Canada
Companies Involved: Northern Bridge and Mat Rentals Ltd
Scope of work: Supply and install 2 km of matting (1000 mats) to allow pipeline crew to access area to install pipeline. Pipeline crews and equipment worked off of the mats to dig trenches and install pipeline.
Photos:
    
   
 
Project: 8-31 Access
Date: June 2006
Location: Pan Can Rd, South Grande Prairie, AB
Client: EnCana
Companies Involved: Northern Bridge and Mat Rentals Ltd
Scope of work: Supply and install matting for 2.5 km of access road and 110mx 110m lease. Approx 2400 mats were used to gain access to the location and mat the lease itself to allow for Drilling rig, Service rig and pipeliners to complete the wellsite.
Photos:
    
   
 
Project: Sierra Lease
Date: June 2005
Location: Ft Nelson, BC
Client: EnCana
Companies Involved: Northern Bridge & Mat Rentals, Precision Drilling
Scope of work: Supply and install matting for 400m of access and 110m x 110m lease. Ground conditions consisted of very wet muskeg. Entire area was matted using 2 layers of mats to provide extra floatation and stability for vehicles traveling to the site and the drilling rig drilling on the site.
Photos:
    
   
 
Project: 6-4 Lease
Date: July 2006
Location: South Wapati, South of Grande Prairie, AB
Client: Cyries Energy
Companies Involved: Northern Bridge & Mat Rentals Ltd
Scope of work: Supply and install matting for 1km of access and 110m x 110m lease. Matting was installed in 1.5 days and drilling rig was drilling on the second day.